
The plumbing is coming together. We are quite excited about the water shut-off system (but hope not to need it for a while). Everything that has a water line is able to be shut-off separately by hot and cold (which are neatly color coded.) The electric is also nearly done. We're hoping to be able to have the "rough inspection" sometime next week.
No comments:
Post a Comment